A few words from the boss of Octopus about standing charges.
https://www.youtube.com/watch?v=DU3f7wB7rVQ
---------- Post added at 11:32 ---------- Previous post was at 11:29 ----------
The UK Targeted Charging Review (TCR) is an Ofgem reform (effective April 2022/2023) that changed how network residual costs are recovered, moving them from volumetric unit rates to fixed daily charges for households and businesses. It aims to make electricity network charges fairer by basing them on capacity rather than usage, impacting TNUoS and DUoS charges.
Key Aspects of the TCR:
Change in Charging Structure: Residual charges for Distribution Use of System (DUoS) and Transmission Network Use of System (TNUoS) are now levied as fixed charges per day, based on your site's Available Supply Capacity (ASC).
For most, these charges are now fixed for the period up to March 31, 2026, and cannot be changed unless there is a significant shift in site infrastructure
https://conceptenergy.org/the-target...or-businesses/