Forum Articles
  Welcome back Join CF
You are here You are here: Home | Forum | Great Western line to be electrified - at last!

You are currently viewing our boards as a guest which gives you limited access to view most of the discussions, articles and other free features. By joining our Virgin Media community you will have full access to all discussions, be able to view and post threads, communicate privately with other members (PM), respond to polls, upload your own images/photos, and access many other special features. Registration is fast, simple and absolutely free so please join our community today.


Welcome to Cable Forum
Go Back   Cable Forum > General Discussion > Current Affairs
Register FAQ Community Calendar

Great Western line to be electrified - at last!
Reply
 
Thread Tools
Old 23-07-2009, 10:08   #1
Chris
Trollsplatter
Cable Forum Team
 
Chris's Avatar
 
Join Date: Jun 2003
Location: North of Watford
Services: Humane elimination of all common Internet pests
Posts: 38,604
Chris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden aura
Chris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden aura
Great Western line to be electrified - at last!

... not that I've ever used, or am ever likely to use the railway between London and south Wales, but it has always seemed strange to me that this important part of our inter-city railway infrastructure has never been electrified.

Well finally it's going to be done, at a cost of £1 billion (which will also pay for electrification of an alternative route between Liverpool and Manchester).

http://news.bbc.co.uk/1/hi/uk/8164070.stm

About time.
Chris is offline   Reply With Quote
Advertisement
Old 23-07-2009, 11:54   #2
injuneer
Inactive
 
Join Date: Feb 2004
Posts: 632
injuneer is a splendid one to beholdinjuneer is a splendid one to beholdinjuneer is a splendid one to beholdinjuneer is a splendid one to beholdinjuneer is a splendid one to beholdinjuneer is a splendid one to beholdinjuneer is a splendid one to beholdinjuneer is a splendid one to beholdinjuneer is a splendid one to behold
Re: Great Western line to be electrified - at last!

I thought in the past the Severn tunnel posed a problem to electrification. i.e clearances for overhead wires & it's permanently soaking wet!
injuneer is offline   Reply With Quote
Old 23-07-2009, 19:42   #3
Nidge
Guest
 
Location: Sutton in Ashfield.
Services: Virgin, phone and 50meg Broadband.
Posts: n/a
Re: Great Western line to be electrified - at last!

Quote:
Originally Posted by injuneer View Post
I thought in the past the Severn tunnel posed a problem to electrification. i.e clearances for overhead wires & it's permanently soaking wet!

They'll have to do something about that, no doubt they'll have some plans in place to stop the water from coming into the tunnel.
  Reply With Quote
Old 24-07-2009, 01:11   #4
frogstamper
Inactive
 
Join Date: Feb 2008
Location: Brighton
Age: 62
Services: VIP
Posts: 3,705
frogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronze
frogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronze
Re: Great Western line to be electrified - at last!

I'm sure somebody can tell me why, but wouldn't it be a lot easier and cheaper to lay a third live rail instead of those overhead lines?
Down here on the South coast and adjoining mainline London routes all our track is electrified this way, also its not so unsightly.
frogstamper is offline   Reply With Quote
Old 24-07-2009, 01:43   #5
Welshchris
Permanently Banned
 
Join Date: Dec 2007
Location: Wales UK
Age: 45
Services: 50mb Cable, L TV and Phone XL.
Posts: 3,480
Welshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful one
Re: Great Western line to be electrified - at last!

Chris r they doing this because of the new trains comining into force in 2012?
I live in swansea and always use the FGW service that runs between Swansea and London, not always as far as London, someones just as far as Cardiff.
Welshchris is offline   Reply With Quote
Old 24-07-2009, 07:56   #6
injuneer
Inactive
 
Join Date: Feb 2004
Posts: 632
injuneer is a splendid one to beholdinjuneer is a splendid one to beholdinjuneer is a splendid one to beholdinjuneer is a splendid one to beholdinjuneer is a splendid one to beholdinjuneer is a splendid one to beholdinjuneer is a splendid one to beholdinjuneer is a splendid one to beholdinjuneer is a splendid one to behold
Re: Great Western line to be electrified - at last!

Quote:
Originally Posted by frogstamper View Post
I'm sure somebody can tell me why, but wouldn't it be a lot easier and cheaper to lay a third live rail instead of those overhead lines?
Down here on the South coast and adjoining mainline London routes all our track is electrified this way, also its not so unsightly.
I don't think 3rd rail systems (750v DC) can deliver enough power for high speed trains, Ok up to about 90 or 100 MPH which wouldn't match the current performance of the IC 125 diesels. The Thameslink trains seem to have a lot better performance under the wires (25,000 V AC) North of London than they do on 3rd rail in the South. AC power distribution is a lot more efficient than DC.
injuneer is offline   Reply With Quote
Old 24-07-2009, 20:56   #7
Chris
Trollsplatter
Cable Forum Team
 
Chris's Avatar
 
Join Date: Jun 2003
Location: North of Watford
Services: Humane elimination of all common Internet pests
Posts: 38,604
Chris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden aura
Chris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden aura
Re: Great Western line to be electrified - at last!

Correct, it's due to insufficient power. Overhead lines deliver 25KV, whereas in the UK third-rail systems are limited to 750V. Much more than that and there's a risk of arcing between the third rail and the nearest running rail. But 750V is nowhere near enough for an express train running at full speed.
Chris is offline   Reply With Quote
Old 25-07-2009, 00:36   #8
frogstamper
Inactive
 
Join Date: Feb 2008
Location: Brighton
Age: 62
Services: VIP
Posts: 3,705
frogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronze
frogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronzefrogstamper is cast in bronze
Re: Great Western line to be electrified - at last!

Thanks for the answers guys, I'd always assumed it purely down to finances, obviously not.
The fastest trains down here run on the Brighton to London line, and I remember talking to a guard a few months back who told me that they very rarely run faster than eighty mph, at the time I just assumed that was because of all the curves in the track.
Having said that the Gatwick express run by Virgin may be a little faster.
frogstamper is offline   Reply With Quote
Old 25-07-2009, 08:52   #9
Chris
Trollsplatter
Cable Forum Team
 
Chris's Avatar
 
Join Date: Jun 2003
Location: North of Watford
Services: Humane elimination of all common Internet pests
Posts: 38,604
Chris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden aura
Chris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden auraChris has a golden aura
Re: Great Western line to be electrified - at last!

Third-rail systems are actually a lot cheaper to install and maintain. I guess we'd see a far wider use of them if it weren't for the capacity issue.

Eurostar trains actually had shoes installed for third rail pickup when they began service in the UK, for use on the line between the chunnel and London. But then this wasn't going to be a big problem as they couldn't get anywhere near fulll speed on that stretch anyway. I believe these may have been removed since HS1 opened - it has overhead wires.
Chris is offline   Reply With Quote
Old 25-07-2009, 11:20   #10
BBKing
R.I.P.
 
BBKing's Avatar
 
Join Date: Jun 2003
Location: London
Services: 20Mb VM CM, Virgin TV
Posts: 5,983
BBKing has a nice shiny starBBKing has a nice shiny starBBKing has a nice shiny starBBKing has a nice shiny starBBKing has a nice shiny star
BBKing has a nice shiny starBBKing has a nice shiny starBBKing has a nice shiny starBBKing has a nice shiny starBBKing has a nice shiny starBBKing has a nice shiny starBBKing has a nice shiny starBBKing has a nice shiny starBBKing has a nice shiny star
Send a message via ICQ to BBKing
Re: Great Western line to be electrified - at last!

Quote:
I'm sure somebody can tell me why, but wouldn't it be a lot easier and cheaper to lay a third live rail instead of those overhead lines?
Maximum speed on third rail is 100mph, so it's not suitable for high speed rail. Apart from this there's the excessive current draw required to run 6,7,8MW electric express trains on 750V DC, which wastes power in heat and requires hefty chunks of metal to conduct it.

3rd rail is also far less safe than overhead for track workers.

Chris - the Eurostar sets have had the 3rd rail shoes removed.
BBKing is offline   Reply With Quote
Old 26-07-2009, 05:05   #11
Welshchris
Permanently Banned
 
Join Date: Dec 2007
Location: Wales UK
Age: 45
Services: 50mb Cable, L TV and Phone XL.
Posts: 3,480
Welshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful oneWelshchris is the helpful one
Re: Great Western line to be electrified - at last!

these new trains i know they r gonna be faster etc, atm it takes around 3hrs and 20mins from Swansea to London Paddington, how much will these new trains shave off that?

i was told it was around 3/4 of an hour tops.
Welshchris is offline   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 03:05.


Server: lithium.zmnt.uk
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
All Posts and Content are © Cable Forum