|
2 to 10 Mb Upgrade queries?
I've been thinking about upgrade my connection for a while (as, at last check, it was only an additional £7 a month to jump from 2Mb to 10MB which is a reasonable jump in speed).
If I rang up today (it's a Saturday) would they be able to put the upgrade into place (as I understood it, the upgrade is done remotely - so it's a case of ringing up, making the request and then waiting for a short while for the upgrade changes to be made) or can it only be done in a weekday?
The modem I have appears to be a NTL Home 120 (it's silver). The downstream power level is currently at -1.41 dBmv, the downstream SNR is at 33.51 dB and the upstream power level is at 32.00 dBmv. Are there issues there which would cause problems with a 10MB connection?
My 2MB connection is pretty solid (I get max speeds throughout the day). If this changes with the upgrade to 10MB is made (if 10MB's is never reached due to overcrowding on the UBR) can I drop to 2MB (or would I be stuck paying the extra for 10MB connection for 12 months)?
Finally, what information do they need to put an upgrade into place? Is it just basics like account number and address or is more information needed?
|