Roadworks
why is it that in the UK when we have roadworks the sings always say it won't be finished for several months or sometimes years. :mad: :mad: :mad: :mad:
On the M6 at Thewall Viaduct work has been going on there since about 2001 or even before then and won't be finished until 2005 :Yikes: :Yikes: :Yikes: if it finishes on time :mad: :mad: The same thing happens all over the country. Why it is when a bid is submitted and they say it will take 6 months to we let the contractors get away with it. They should work 24/7 and get it finished on time or earlier or face financial penalties. They want to finish late to get more money. They should be rewarded for finishing early. In the US i've seen entire motorways repaved in a few days and they worked non stop to get this done. No wonder we can't get anywhere in the country. It would be quicked for me to fly to New York from London and my sister to do the same from manchester airport than it is to drive up the motorway |
Re: Roadworks
Quote:
At the Thelwall Viaduct, they are working on crumbling old concrete bridge supports, which is vastly more complicated than just closing a road to re-pave it. It's taking ages due to the complicated nature of the work, not because the contractor is spinning it out to make more money. They do close stretches of British motorway when resurfacing is required. The work is done overnight in order to cause minimum disruption. A stretch of the M1 between the M25 and Hemel Hempstead has recently been done in this way (actually, only the entry/exit slips were completely closed - they kept one lane of through traffic open and re-surfaced one lane at a time, overnight, for a week. It still caused huge tailbaks, even at midnight on a Sunday/Monday, as I found out to my cost :( ) But you can only do this when it's just the tarmac that's worn out and needs to be replaced. When the underlying structure of the road begins to decay, you have to dig the lot up and start again. Again, that takes time, and you just can't shut an entire motorway for six weeks while you do the work. |
Re: Roadworks
Quote:
What really needs asking is what damn fool allowed them to build a 3 lane M25 when predictions said it would be running at capacity when opened. |
Re: Roadworks
it just really annoys me that when you go past these places late at night , early morning or at weekends you never see anyone working.. I remember after the last earthquake in the US at LA they rebuilt most of the motoways in about 2 months.. somehow I don't think we could do the same...
i know some of this is complex engineering works and will take time but i think if we had people working 24/7 we could get some of these roadworks done quicker. |
Re: Roadworks
But look at how long the roadworks in Boston are taking
www.bigdig.com http://www.bigdig.com/thtml/summary.htm http://www.bigdig.com/thtml/schedule.htm <-this one shows the timeline :Yikes: |
Re: Roadworks
Quote:
|