Quote:
Originally Posted by Chrysalis
Note there 'wasnt' a requirement but now its important. So you havent explained why they cant do it. The only reason I can think of is saving money both in the labour requirement of doing the work and the bandwidth savings from people having lower synch speeds.
|
Bandwidth savings are irrelevant as the bandwidth BT supply is controlled by the MST and Ofcom anyway. If BT are found to be supplying a contention ratio that's too low they can be slapped.
Can I remind you that Openreach had to get permission to borrow workers from BT Wholesale in order to tackle the LLU installation backlog? This is
not about BT being cheap. They are constantly hamstrung by the regulations they are forced to operate within.
There is an Openreach recruitment drive which has been running for a while I believe.
Quote:
|
Its the same with the BRAS profiles, they drop within 75 minutes of a low synch but need 3 days to increase another way to save bandwidth,
|
Good reason for that and it's not related to saving bandwidth from BT's point of view but from making sure it's shared fairly. The traffic combing that's done wouldn't necessarily work properly if profiles bounced up and down along with sync in real time, it would require not inconsiderable BRAS resources.
I believe that BRAS profiles increase much more quickly now anyway? Speaking to a relative who has maxDSL his BRAS profile operates in near real time.
It's a pretty complicated system so putting it down to BT being cheap isn't really accurate. BT invested a not inconsiderable amount of cash in their maxDSL system, relative to that a few hundred Mbits of ATM bandwidth is nothing. Consider what BT are spending on 21CN as well. It's not about money.
Quote:
|
BT cant do anything about their own building layouts?
|
Not really no. Exchanges weren't really built with hosting several racks of other operators' equipment in them. You think BT like having that extra copper there? They can't just rearrange MDF, UPS and all the other equipment in every exchange, it's not practical.
OLO hostels / colo rooms are placed where it is practical to place them. In some exchanges the space saved by removal of the analogue equipment is where that kit has to go. It's not just a random decision it has to be done based on availability of power, aircon, access and security arrangements, ease of jumpering, etc.
Again I don't see BT or any other telephone company in the world spending massive amounts of cash to rewire exchanges to shorten people's loops by a couple of hundred metres. After they do that then the question is asked why they can't rewire the outside plant to minimise cable lengths. It's really not worth under any circumstances, especially when FITL and FTTH aren't that far away and are a far more future-proof solution than wasting money on copper.
BT are spending billions on converting to an all-IP network, some sites are getting FTTH, FITL is under trial. The main thing holding these projects back is regulatory approval and regulatory regime.
Get Ofcom to allow BT to run fibre to homes with permission to put TV down it and without having to unbundle it and I think distance will quickly become irrelevant