Forum Articles
  Welcome back Join CF
You are here You are here: Home | Forum | Returning To Virgin Media?

You are currently viewing our boards as a guest which gives you limited access to view most of the discussions, articles and other free features. By joining our Virgin Media community you will have full access to all discussions, be able to view and post threads, communicate privately with other members (PM), respond to polls, upload your own images/photos, and access many other special features. Registration is fast, simple and absolutely free so please join our community today.


Welcome to Cable Forum
Go Back   Cable Forum > Virgin Media Services > Virgin Media News Discussion
Register FAQ Community Calendar

Normal Procedure?
Reply
 
Thread Tools
Old 04-11-2010, 13:06   #1
VMboy
Inactive
 
Join Date: Oct 2008
Posts: 1,049
VMboy is infamous around these partsVMboy is infamous around these parts
Normal Procedure?

Is it normal procedure to leave a Virgin Media cable pavement box plate open if the engineer needs to go away to an exchange perhaps?

The red barricade is in place for safety, but as it is a wet day I didn't think it was wise for this not to be covered in these rainy conditions.

Thoughts please.

Sorry if this isn't in the correct section.
VMboy is offline   Reply With Quote
Advertisement
Old 04-11-2010, 13:25   #2
weesteev
Cable Guru
 
Join Date: Jun 2004
Location: Scotland
Age: 43
Services: Virgin Media Gig1 RFOG, TV360, Stream, GoFibre 1Gb
Posts: 1,050
weesteev has reached the bronze age
weesteev has reached the bronze ageweesteev has reached the bronze ageweesteev has reached the bronze ageweesteev has reached the bronze ageweesteev has reached the bronze ageweesteev has reached the bronze ageweesteev has reached the bronze ageweesteev has reached the bronze ageweesteev has reached the bronze age
Re: Normal Procedure?

As long as it is signed and gaurded appropriatley then it should be ok (from a health and safety point of view). If its raining then its not very wise but for short periods of time then it will be ok. The chambers arent water tight so will have some water ingress at some time in thier lives, all connections (540/860 coax and copper) are shrink wrpped at the joints so water ingress shouldnt be an issue and the Telco BOM's are sealed (if its a SID area). Unless Noah's ark is required then rain shouldnt cause an issue to an open pit.
weesteev is offline   Reply With Quote
Old 04-11-2010, 18:32   #3
VMboy
Inactive
 
Join Date: Oct 2008
Posts: 1,049
VMboy is infamous around these partsVMboy is infamous around these parts
Re: Normal Procedure?

Quote:
Originally Posted by weesteev View Post
As long as it is signed and gaurded appropriatley then it should be ok (from a health and safety point of view). If its raining then its not very wise but for short periods of time then it will be ok. The chambers arent water tight so will have some water ingress at some time in thier lives, all connections (540/860 coax and copper) are shrink wrpped at the joints so water ingress shouldnt be an issue and the Telco BOM's are sealed (if its a SID area). Unless Noah's ark is required then rain shouldnt cause an issue to an open pit.
Thanks mate, I was just curious, by the way what does SID stand for?
VMboy is offline   Reply With Quote
Old 05-11-2010, 07:47   #4
weesteev
Cable Guru
 
Join Date: Jun 2004
Location: Scotland
Age: 43
Services: Virgin Media Gig1 RFOG, TV360, Stream, GoFibre 1Gb
Posts: 1,050
weesteev has reached the bronze age
weesteev has reached the bronze ageweesteev has reached the bronze ageweesteev has reached the bronze ageweesteev has reached the bronze ageweesteev has reached the bronze ageweesteev has reached the bronze ageweesteev has reached the bronze ageweesteev has reached the bronze ageweesteev has reached the bronze age
Re: Normal Procedure?

SID is an architecture type used in Telecoms by both BT and Virgin. It releates to the the Telephony architecture, you can tell as the pit lids will have a little badge with the Kite symbol (British Standard) and a stamp that says SID. Newer BT covers and Virgin SID areas will display this but only if the pit lids are elss than 10 years old.

There is also CAB architecture (also known as SBD) where the termination points arent normally in chambers in the ground outside your home but an entire cable run from the home back to a small cabinet (or pedestal) where the customer connection points are. This tends to be more commonly found in ex-NTL areas but is also found in small pockets of ex-Telewest areas as well.

BT uses SID architecture for its underground deployment, you will find an enclosure (referred to as a Bomb) with D side connections where customer conenctions first terminate (before heading to an E-side connection at the nearest cabinet (or distribution point).

http://www.hellermanntyton.co.uk/doc...logue_0809.pdf

See page 25 onwards of above document for more details.

Hope this helps
weesteev is offline   Reply With Quote
Old 05-11-2010, 09:29   #5
VMboy
Inactive
 
Join Date: Oct 2008
Posts: 1,049
VMboy is infamous around these partsVMboy is infamous around these parts
Re: Normal Procedure?

Thank you.
VMboy is offline   Reply With Quote
Old 06-11-2010, 11:19   #6
jungleguy
Inactive
 
jungleguy's Avatar
 
Join Date: Sep 2007
Services: phone TV & BB
Posts: 431
jungleguy is a glorious beacon of lightjungleguy is a glorious beacon of lightjungleguy is a glorious beacon of lightjungleguy is a glorious beacon of lightjungleguy is a glorious beacon of lightjungleguy is a glorious beacon of lightjungleguy is a glorious beacon of light
Re: Normal Procedure?

Weesteev in new build do you still use SID architecture?
jungleguy is offline   Reply With Quote
Old 08-11-2010, 22:27   #7
weesteev
Cable Guru
 
Join Date: Jun 2004
Location: Scotland
Age: 43
Services: Virgin Media Gig1 RFOG, TV360, Stream, GoFibre 1Gb
Posts: 1,050
weesteev has reached the bronze age
weesteev has reached the bronze ageweesteev has reached the bronze ageweesteev has reached the bronze ageweesteev has reached the bronze ageweesteev has reached the bronze ageweesteev has reached the bronze ageweesteev has reached the bronze ageweesteev has reached the bronze ageweesteev has reached the bronze age
Re: Normal Procedure?

Yes, we have to build to the existing network architecture. We cant just alter how we distribute services from a node unfortunately.
weesteev is offline   Reply With Quote
Old 09-11-2010, 06:27   #8
jb66
cf.mega poster
 
jb66's Avatar
 
Join Date: Aug 2009
Posts: 5,386
jb66 has a bronze arrayjb66 has a bronze arrayjb66 has a bronze array
jb66 has a bronze arrayjb66 has a bronze arrayjb66 has a bronze arrayjb66 has a bronze arrayjb66 has a bronze arrayjb66 has a bronze arrayjb66 has a bronze arrayjb66 has a bronze arrayjb66 has a bronze array
Re: Normal Procedure?

Quote:
Originally Posted by VMboy View Post
Is it normal procedure to leave a Virgin Media cable pavement box plate open if the engineer needs to go away to an exchange perhaps?

The red barricade is in place for safety, but as it is a wet day I didn't think it was wise for this not to be covered in these rainy conditions.

Thoughts please.

Sorry if this isn't in the correct section.
Most of the pits in edinburgh are half full of water anyway
jb66 is offline   Reply With Quote
Old 09-11-2010, 13:15   #9
weesteev
Cable Guru
 
Join Date: Jun 2004
Location: Scotland
Age: 43
Services: Virgin Media Gig1 RFOG, TV360, Stream, GoFibre 1Gb
Posts: 1,050
weesteev has reached the bronze age
weesteev has reached the bronze ageweesteev has reached the bronze ageweesteev has reached the bronze ageweesteev has reached the bronze ageweesteev has reached the bronze ageweesteev has reached the bronze ageweesteev has reached the bronze ageweesteev has reached the bronze ageweesteev has reached the bronze age
Re: Normal Procedure?

Quote:
Originally Posted by jb66 View Post
Most of the pits in edinburgh are half full of water anyway
Haha, i can imagine half the pits in the UK are full when it rains! Its hard to keep water from ingressing into these chambers, espcially chambers from the days of main build! Needless to say, all equiment in these chambers should be water resistent (to a certain degree).

weesteev is offline   Reply With Quote
Old 15-11-2010, 17:30   #10
Dave_
Inactive
 
Join Date: May 2010
Posts: 36
Dave_ is an unknown quantity at this point
Re: Normal Procedure?

Huge areas of the uddingston franchise have horrific water ingress , i had 7 jobs in the one street where an amp blew due to water.

Would help if installers carried rubber o-rings to help keep the water out the bom too.
Dave_ is offline   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 12:19.


Server: lithium.zmnt.uk
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
All Posts and Content are © Cable Forum