Quote:
Originally Posted by Damien
Nah didn't have anything fitted.
Look at what happened after 2pm!
[img]Download Failed (1)[/img]
|
I was seeing graphs like this when the downstream power levels had drifted out of band (between -3 and -8 db in my case).
I took out the 6db FPA which brought them back into band:
If you have no FPA, I think the Engineer is required to do something at the patch panel in the (black) street cabinet to up the power levels. Might be wrong though ..
It will be interesting to see what he (or she) says ..