Quote:
Originally Posted by General Maximus
At least we are not in limbo with a 2 year rollout schedule and know we are going to get before Christmas.
|
To be fair, from the first launch of gig1 in southampton in sept 2019 to dec 2021 when they said it would be done, was a 2 year rollout schedule people were left in limbo for.
And you have more confidence than me in VM delivering before xmas!!
I've had info from Cityfibre that puts me mid-late 2022 for my part of Ipswich, so if VM do hit their target I will perhaps go back to them (with a heavy heart) until CF reach me, although the second CF are available I'll move to them, even if there is some overlap.