Quote:
Originally Posted by richard s
Remember to make sure the water pipes are not hidden behind the wall when drilling Taf.
|
All pipes are in front of the wall due to the construction method.
---------- Post added at 10:25 ---------- Previous post was at 10:22 ----------
Quote:
Originally Posted by heero_yuy
Or any electrics.
The other way to be sure of a decent fixing is to locate the studs and fix into them if they are conveniently located.
|
No studs as it's dot'n'dab plasterboard onto aerated concrete blocks, which are so feeble you can push your finger into them, so not able to bear loads.