Re: It's nearly here!
I have an install date in January, a connection point has been installed and the cable pull has taken place. The ducting which runs up my drive and was installed when the house was built is well and truly blocked, VM know this and have installed the connection point next to the man hole which located on my front garden the cable connecting the Connection point to the house, as I understand it, will be buried in the earth.
On the install date will the Engineer run the cable from the connection point to the house and complete the install, cable, router, set up, etc?
Last edited by Peter729; 16-12-2017 at 11:45.
Reason: addition
|