Quote:
Originally Posted by Tali
If your current supplier is the one that installed it, they should be able to talk to it.
If it was installed in the last 12 months or so, it should be 2nd generation meter and any supplier should be able to talk to it.
|
They've never been able to read it since it was installed. I think it's a dud.
__________________
History is much like an endless waltz: The three beats of war, peace and revolution continue on forever.
However history will change with my coronation - Mariemaia Khushrenada