Quote:
|
Originally Posted by Web-Junkie
If the leccy's failed, what's powering the UBR's? Is there a peddle powered emergency generator in the exchange being peddled by a rather pee'd off engineer 
|
If there were an engineer I think he would be pee'd up rather than off