Quote:
|
Originally Posted by Stuart C
Ignition was some sort of network engineer for NTL (not sure exactly what he did), so does know what he is talking about.
Anyway, back to the topic. If Telewest are operating UBRs at 87% of capacity, they need to spend some serious money upgrading.
|
Both companies need to dip their hands into their pockets and set about some upgrading by the looks of the threads on here.
That or work on other ways to keep the usage down a bit or control it.