Quote:
|
Originally Posted by Ignition
Would be great if CWC hadn't bought most of it rather than building it, also don't underestimate how much work ntl have done on those networks.
BTW This is the same CWC that bought us the Videotron build, so if we're describing everything on the EuroDOCSIS platform as being thanks to CWC they also brought with them some real, real cr@p. Some of the reasons for the banal performance of Videotron build are not that different from some of the Langley build being poorly, others aren't - there's no Langley / Ex-Cabletel area built as poorly as Southampton (Ex-Videotron).
Some Ex-CWC engineers have been naturally retained, though CoCo had its' share of dodgy engineers same as Cabletel.
Probably best you don't try and tell me about how the networks I work on work, nor how my employer works 
|
Nildram on ADSL is outperforming me like for like right now so if this is supposed to be state of the art its worrying