Quote:
Originally Posted by vm_tech
Yea. The one on the right is the hfc fibre node. The telco cabs come prebuilt with all kit on so the base is installed then power, then the cab with kit is lifted on the same day the power is done I believe
---------- Post added at 19:02 ---------- Previous post was at 19:02 ----------
Sorry one on the left is the hfc
|
So the yellow covers just a temp cover until the rest of the cabs moves into place?