Thread: Superhub Self install problem
View Single Post
Old 28-05-2016, 17:12   #4
General Maximus
cf.mega poster
 
Join Date: Nov 2008
Location: Lincoln
Services: phone + 1gbit BB + SkyQ
Posts: 11,021
General Maximus is cast in bronzeGeneral Maximus is cast in bronzeGeneral Maximus is cast in bronzeGeneral Maximus is cast in bronze
General Maximus is cast in bronzeGeneral Maximus is cast in bronzeGeneral Maximus is cast in bronzeGeneral Maximus is cast in bronzeGeneral Maximus is cast in bronzeGeneral Maximus is cast in bronzeGeneral Maximus is cast in bronzeGeneral Maximus is cast in bronzeGeneral Maximus is cast in bronzeGeneral Maximus is cast in bronzeGeneral Maximus is cast in bronzeGeneral Maximus is cast in bronze
Re: Self install problem

it might be the same connector but the current/volts/wattage may be different. As an example, even though the psu's for the shubs will "connect" to any shub, they actually require their model specific psu. If you use a shub1 psu for a shub2 you'll break it.

Anyways, I think you are normally looking at 4 hours on average for a shub activation. You can tell when it is activated by looking at how many downstream channels it has locked on to. Atm it will only be 1 and it will change to 8 when everything is up and running.
General Maximus is offline   Reply With Quote