Quote:
Originally Posted by DJSADERS
There is ongoing utilization (capacity) issues on the Thames Valley network, due to be fixed by end of feb early march hopefully, i have seen this all over the network so your not alone.
|
I wouldn't word it that way exactly, as utilisation issues are on a node by node basis, not franchise basis. When I was a service tech I worked in Thames Valley quite a lot, there are a lot of nodes there, so just because there are a few nodes with high utilisation it doesn't mean the whole franchise is affected. As an example some of the postcode areas I cover have upwards of 20 nodes.