Quote:
Originally Posted by DJSADERS
If it's in conduit i would be very very suprised as most are not, tech will probs use a 9083 meter on the spare pair in the drop and use those if all is good, if not take a new piece of wire from the Tee (access point in path) up the the ETB (box on outside wall of house)
|
Well they were all done like that round here, mind you that was back in the NTL days though it was McNicholas that cabled up the area. I assumed this was best practice?
__________________
History is much like an endless waltz: The three beats of war, peace and revolution continue on forever.
However history will change with my coronation - Mariemaia Khushrenada