Quote:
Originally Posted by Perfect Choice
VM ahead of BT plans then and happy to receive my increase from 50 to 100MB download.
I know BT are asking internal staff for triallists internally for their ultrafast BB using G.fast (300MB+) at 2 locations. But that sounds start of trials so 12 months behind VM?
|
If I was a betting man, I'd bet that Virgin is relying on being able to be at least 2x what BT can do. So while they're rolling out 300Mbit now, it's in anticipation of G.fast rollouts starting, so that in 12-18months time, 300Mbit can turn to 600Mbit and beyond.
Of course, there's a convergence then, as DOCSIS 3.1 should be getting trailed and rolled out around then.
It's not a bad little arms race to be on the sidelines of