Quote:
Originally Posted by linwelin
|
The 1000Mb isn't G.fast, and the G.fast deployment will start at 'hundreds' of Mb ramping up to 500Mb within 10 years.
VM can be 600Mb capable by 2016/2017 if the commercial need is there.
---------- Post added at 10:23 ---------- Previous post was at 10:22 ----------
Quote:
Originally Posted by General Maximus
sweet, it can only be a good thing and make VM pull their finger out and get docsis 3.1 going
|
VM still don't need DOCSIS 3.1 and the kit still isn't available. Early trials starting at the back end of this year with early commercial deployments among some cable companies starting next year.
---------- Post added at 10:25 ---------- Previous post was at 10:23 ----------
Quote:
Originally Posted by Martin Dee 11
|
As I understand it there are multiple vendors being considered for the equipment. It's far from impossible VM will use the same kit as the rest of the LGI family.