Quote:
Originally Posted by Kursk
Rang those nice people at VM today and asked if the 30 to 50 speed upgrade could be brought forward - the answer was yes! No change to contract; no change to cost. An engineer was also booked to 'check my power levels'. Can someone tell me what's involved and how long the bloke will be here please?
Oh and thanks VM! 
|
I don't know why they felt the need for an engineer to do that, that can be done over the phone by getting you to navigate to
http://192.168.100.1 but either way it should be a 5min job unless there's actually an issue, in which case it'll be a 5min 10s job.