Quote:
Originally Posted by Kushan
In their defence, BT has done the same with FTTC (Vectoring comes to mind).
|
I don't recall BT ever promising to deploy vectoring by any date, only that it was "being investigated" as a possible future upgrade, no different to VM and DOCSIS 3.1.
A more accurate comparison would be the upgrade of everyone from 2Mb to 10Mb upload or deployment of 80/20. They usually announce a rough date (e.g. "Next spring") and usually stick to it (though they sometimes miss by a week or two, and 1Gbps has kinda become vaporware)