Thread: 50M Area Upgraded?
View Single Post
Old 03-01-2013, 12:57   #18
Kushan
FORMER Virgin Media Staff
 
Join Date: Dec 2010
Location: Warrington
Posts: 4,737
Kushan has a bronzed appealKushan has a bronzed appeal
Kushan has a bronzed appealKushan has a bronzed appealKushan has a bronzed appealKushan has a bronzed appealKushan has a bronzed appealKushan has a bronzed appealKushan has a bronzed appealKushan has a bronzed appealKushan has a bronzed appealKushan has a bronzed appealKushan has a bronzed appealKushan has a bronzed appealKushan has a bronzed appealKushan has a bronzed appealKushan has a bronzed appealKushan has a bronzed appealKushan has a bronzed appealKushan has a bronzed appealKushan has a bronzed appealKushan has a bronzed appeal
Re: Area Upgraded?

Quote:
Originally Posted by telfordcable View Post
They are rubbish - now worse than BT why take so long between March 2012 and December 2013 is approx 21 months to wait! or could be longer than that.

BT FTTC is the winner overall.
I don't think it's fair to criticise the length of the rollout for whatever it is that VM's doing. They have a pretty big network, you can't expect them to just upgrade the whole thing over night. BT hasn't upgraded their entire network to FTTC, either.

The length of the rollout is largely irrelevant, the main things Virgin are responsible and should be criticised for is their communication over the rollout (delays are to be expected, but to say an area is upgraded when it's clearly not?), the training of their CS staff, the quality of their equipment, etc.
Kushan is offline   Reply With Quote