Quote:
Originally Posted by The Installer
With this type of architecture that is correct, the levels are preset.
Remember that not all areas have the same type of network build.
|
ok. generally you say steps of repull then amp check. could networks not check the amp straight away rather than do a repull (waste money) ? unless ofcourse the cables are old or damaged that needs replacing.