Quote:
Originally Posted by Masque
I mean any area not just yours, I expect it will be over about 18 months as with the 100Mb rollout if not longer.
|
No it'll be quicker than that, the upgrades are basically capacity upgrades per previous uplifts rather than the big time line card and hardware swaps that were done for the 100Mb and the several months of nut scratching done on the upstream uplift.