Quote:
Originally Posted by Ignitionnet
No point from VM's angle in upgrading the upstream, they're struggling enough to supply 10.24Mb/s and it's not advertised so not subject to the same regulations.
|
When VM rolls out 8 downstream channels should they also be increasing the upstream channels to 2? My >350Mb trial modem had 8 channels down and 2 up. Upstream was configured to 25Mb. This gave me 24Mb up.
Right now the upstream is not very consistent. As you say VM seem to be struggling to deliver. Two up channels would spread the load, would they not? Surely they would have to be capable of finding an extra channel up when they roll out 200Mb/20Mb.
Quote:
Originally Posted by Ignitionnet
I would join your speed wave but I'm not sure if my 53Mb downstream would help and my 1.75Mb up definitely wouldn't.
|
13 folk have joined the speed wave so far. Your connection would be one of the better ones.............. apart from your upstream.