View Single Post
Old 09-11-2010, 06:27   #8
jb66
cf.mega poster
 
jb66's Avatar
 
Join Date: Aug 2009
Posts: 5,386
jb66 has a bronze arrayjb66 has a bronze arrayjb66 has a bronze array
jb66 has a bronze arrayjb66 has a bronze arrayjb66 has a bronze arrayjb66 has a bronze arrayjb66 has a bronze arrayjb66 has a bronze arrayjb66 has a bronze arrayjb66 has a bronze arrayjb66 has a bronze array
Re: Normal Procedure?

Quote:
Originally Posted by VMboy View Post
Is it normal procedure to leave a Virgin Media cable pavement box plate open if the engineer needs to go away to an exchange perhaps?

The red barricade is in place for safety, but as it is a wet day I didn't think it was wise for this not to be covered in these rainy conditions.

Thoughts please.

Sorry if this isn't in the correct section.
Most of the pits in edinburgh are half full of water anyway
jb66 is offline   Reply With Quote