Normal Procedure?

Is it normal procedure to leave a Virgin Media cable pavement box plate open if the engineer needs to go away to an exchange perhaps?

The red barricade is in place for safety, but as it is a wet day I didn't think it was wise for this not to be covered in these rainy conditions.

Thoughts please.