|
Re: 50Mb install Question
If you had 50meg and downgraded you would be left with the 50meg modem-if you then wanted to upgrade again you would not need an engineer as you would already have the equipment(this is what VM told me when i downgraded from 50 to 20)
Otherwise i would say yes you will need an engineer to call.
|