Quote:
Originally Posted by |Kippa|
How long do you think it will take for them to increase the upload speed? Even if it is by a small amount to like 2mbit up. Do you think they would increase it in the space of say 12 months after the launch?
|
I would say that well within 12 months VM will be trialling higher upload speeds..
It will increase significantly over time, but it will be small steps once they go above 2.5Mb/s.