|
Re: New trial Wigan Area
Just got off the phone to “The Bloke in the Pubâ€Â.
I asked him about the new STM trials, his answer was,
Current STM is designed to stop the network collapsing prior to the switch to DOCSIS 3.
Trials of the new STM time ranges are testing to see what level will be required during the upgrade period in order to keep outages to a minimum. VM are trying to keep everyone connected (as much as possible) during the network upgrades, STM will be removed once all areas are upgraded, sometime late 2009.
So it seems VM had to choose to switch areas off completely for a time or spread the load and keep everyone connected, looks like they are going to choose the lesser of two evils.
|