Quote:
Originally Posted by Chrysalis
I think we talking diff levels of waste here. You are talking about rearranging an exchange to gain 100m.
I am talking about stopping having a km of cable of loop length wrapped around a spindle. This is confirmed in some exchanges I know off.
|
I'd quite like to see where this is confirmed
Quote:
|
I assure you cost is a factor BT make many decisions every day to avoid cost.
|
So do every other company, but trying to save bandwidth isn't a reason for them trying to save cash. A lot of BT's revenue streams are controlled externally and assume a certain level of costs, they can't raise and lower prices as they see fit for most products as you know and the labour required to shorten loop lengths in this manner wouldn't be trivial and would be a waste of time with FITL in the future.