Quote:
Originally Posted by Chrysalis
seems I was wrong about 21cn the docs rlsed by BT have no mention of fibre in the local loops meaning less then half will see anything above 8mbit on adsl2+. Its a possibility for sure now in 2011 when bt are still finishing of 21cn they still relying on copper local loops. My area isnt getting 21cn until Q2 2010.
|
i think its reasonable to assume that by 2010 WiMax will be widespread if the industry has anything to do with it and hence that last mile will be covered, thats one of the reasons why i advocate wireless as standard in future stb's etc.