|
Re: Is it possible to order NTL cable?
Quote:
|
Originally Posted by andre
The fact is that the cable is running under the floorboard.
Engineer would come to the flat in a rush and wants to do it pretty quick.
I'd like to lift the floorboards in my own spare time and do it myself.
Thanks
Andrea
|
Couldn't you lift the floorboards ahead of the engineer arriving, have the engineer lay the cables and then put the floorboards back after he leaves?
__________________
Remember kids: We are blessed with a listening, caring government.
|