![]() |
Ow the pain!
Owww, the pain!!!!!!!!!
This is what happened in Vancouver, Canada when a contractor did not measure correctly before drilling 6 steel rods into the side of an imbankment for support. They drilled into 7 cables, which contained over 23,000 pairs and 144 fibers. It took 8 days 24/7 to repair the damage. Ugh.... nightmares! http://home.cogeco.ca/~johannj/net_stuff/01.jpg http://home.cogeco.ca/~johannj/net_stuff/02.jpg http://home.cogeco.ca/~johannj/net_stuff/03.jpg http://home.cogeco.ca/~johannj/net_stuff/04.jpg |
Re: Ow the pain!
I used to work for BT years ago - loads of sudden major failures were due to JCB's digging up cables.
|
Re: Ow the pain!
I bet somebody's head rolled..
|
Re: Ow the pain!
Wonder if they'd used shielded rods would this of reduced cross talk?
|
Re: Ow the pain!
truly the stuff of nightmares :bigcry: :bigcry: :bigcry: :bigcry:
|
All times are GMT +1. The time now is 11:22. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
All Posts and Content are © Cable Forum