![]() |
Re: Vmng300
If you are lucky enough that the engineer has a VMNG300 on the van, then you get that. If not, then you get the Superhub. The VMNG is a rare beast now, so its highly likely that you get your service 'fixed' with the hub.
|
Re: Vmng300
Quote:
|
Re: Vmng300
You WILL get a superhub. If I ever do see a vmg300 again i'll be keeping it for myself!!!
|
Re: Vmng300
Quote:
|
Re: Vmng300
Quote:
---------- Post added at 22:00 ---------- Previous post was at 21:59 ---------- Quote:
|
Re: Vmng300
Quote:
What did I pay the £30 for then? I can remember paying £50 and £30. I thought the £50 was for the modem and £30 for connection. |
Re: Vmng300
Quote:
|
Re: Vmng300
:LOL: i am definitely in the wrong job; £30 for him to bring it round (I "installed" it) and £50 to make a phone call. I love it.
|
Re: Vmng300
Techs don't get that ..
|
Re: Vmng300
my area goes 100Mbit in September. I currently have a modem for my 50Mbit. Will i get to keep it or will i be foisted with a new SuperHub? by all accounts it seems the modem an separate router is the preferred option. having said that do you all think they will have the firmware bugs in the SuperHub ironed out by September?
|
Re: Vmng300
Quote:
|
Re: Vmng300
hya i dont want to throw a spanner in to peoples works ,
but i upgraded to 100mbit over the phone no install or anyting and i got to keep my vmng300 . the trow ubr went live with 100mbit i just called 150 asked for an upgrade to 100mbit.. she tryed to give me a superhub but after telling her i did not want the hub but gladly have the service she aggreed ..i told her i was already on 50 with a vmng300 and i like the modem. i told her my levels was ok. then she diverted me to the second line where levels and network test was carried out and was good.i was them but back to the sales call center .he hit the modem with a new 100mbit config. so here i am with a vmng300 in to a dir 615(ddwrt) and bits running lovely.. Network Access : Allowed Maximum Number of CPEs : 1 Baseline Privacy : Enabled DOCSIS Mode : DOCSIS 3.0 Config File : not on your nelly.cm Primary Downstream Service Flow SFID : 12648 Max Traffic Rate : 102400000 bps Max Traffic Burst : 10000 bytes Min Traffic Rate : 0 bps Primary Upstream Service Flow SFID : 11529 Max Traffic Rate : 10250000 bps Max Traffic Burst : 16320 bytes Min Traffic Rate : 0 bps Max Concatenated Burst : 16320 bytes Scheduling Type : Best Effort ---------- Post added at 23:42 ---------- Previous post was at 23:39 ---------- DS-1 DS-2 DS-3 DS-4 Frequency 299000000 307000000 315000000 323000000 Lock Status (QAM Lock/FEC Sync/MPEG Lock) Y/Y/Y Y/Y/Y Y/Y/Y Y/Y/Y Channel Id 33 34 35 36 Modulation 256QAM 256QAM 256QAM 256QAM Symbol Rate (Msym/sec) 6.952 6.952 6.952 6.952 Interleave Depth I=12 J=17 I=12 J=17 I=12 J=17 I=12 J=17 Power Level (dBmV) 6.47 6.38 6.42 6.18 RxMER (dB) 37.36 37.36 37.94 37.94 Correctable Codewords 1039 1471 2074 1610 Uncorrectable Codewords 344 320 1019 1566 https://www.cableforum.co.uk/images/local/2011/03/9.png |
Re: Vmng300
/me waits for VM staff to think of excuse why they were wrong. Although I admit I am surprised someone came on with it been successful. But does sort of prove my point when pushed with financial loss from a customer VM will capitulate.
|
Re: Vmng300
There is no excuse for what they've done. Those agents have not done their jobs correctly. Nothing more or less than that.
I would expect that will be picked up by their managers, and they will be retrained, as any person not doing their job correctly should be |
Re: Vmng300
hmm good idea, lets retrain staff who succeeded in increasing revenue from a customer. hmmm.
I got an alternative idea. retrain manager's who think its good to have rigid inflexible process that just annoys customers to the point its affecting churn and turnover. |
| All times are GMT. The time now is 09:29. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
All Posts and Content are © Cable Forum