![]() |
Re: New Speeds - June 1st
My speeds are varying between 4mb and around/below 2mb? :confused:
|
Re: New Speeds - June 1st
Just done a speed test here and it's still 2meg (manchester baguely server) Of course, after my post a few pages back I realised something. I had switched down from 10 meg because I haven't been getting great speeds. Primarily, I think, because of the student population. But a lot of them are vanishing for the summer - I could have stayed on 10meg for a few months and maybe enjoyed super speeds for a while. What an idiot!!
|
Re: New Speeds - June 1st
Quote:
|
Re: New Speeds - June 1st
Quote:
|
Re: New Speeds - June 1st
Rebooted STB in sunny Poole and got a mixed result
Tue, 13 Jun 2006 21:54:00 GMT 1st 512K took 2172 ms = 235.7 KB/sec, approx 1942 Kbps, 1.9 Mbps 2nd 512K took 1656 ms = 309.2 KB/sec, approx 2548 Kbps, 2.49 Mbps 3rd 512K took 2265 ms = 226 KB/sec, approx 1862 Kbps, 1.82 Mbps 4th 512K took 1312 ms = 390.2 KB/sec, approx 3215 Kbps, 3.14 Mbps Overall Average Speed = approx 2392 Kbps, 2.34 Mbps This is through wireless router. Seems to be a step in the right direction BJ |
Re: New Speeds - June 1st
HI, new member here in poole also still showing 2 meg, well 1.9 really:(
|
Re: New Speeds - June 1st
I was on 4Meg, but after having to reboot my ntl100 modem I'm back down to 2Meg.
Odd. |
Re: New Speeds - June 1st
Quote:
|
Re: New Speeds - June 1st
Well am in Birkenhead and I am still on around 1.8/1.9mb so no update yet.
|
Re: New Speeds - June 1st
Quote:
|
Re: New Speeds - June 1st
The upgrades will be done by uBR / card and not necessarily by each big 'area' so it's quite possible that while someone in a town is on the 4Mbit someone on the other side of town is not :)
---------- Post added at 01:38 ---------- Previous post was at 01:37 ---------- Quote:
---------- Post added at 01:42 ---------- Previous post was at 01:38 ---------- Quote:
---------- Post added at 01:43 ---------- Previous post was at 01:42 ---------- Quote:
|
Re: New Speeds - June 1st
still nothing in Brighton
|
Re: New Speeds - June 1st
Network Access : Enabled Maximum Downstream Data Rate : 10240000 bps Maximum Upstream Data Rate : 512000 bps Maximum Number of CPEs : 1 Software Upgrade File Name : ntlhm100_ntl0002.cpr Software Upgrade AdminStatus : allowProvisioningUpgrade Software Upgrade OperStatus : completeFromProvisioning
Guildford upgraded, not sure to what. The modem got a new firmware. The software says ntlhm100 but the modem is ntl250.... And of course is dead slow -dial up speed and below. So, I am off to call Bombay and pay 10p per minute for the pleasure |
Re: New Speeds - June 1st
that's 10meg
|
Re: New Speeds - June 1st
Quote:
|
| All times are GMT. The time now is 01:05. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
All Posts and Content are © Cable Forum